Scope of Supply: Pumps, ARC Valves
The FPSO Cidade de Santos MV20, deployed in the Urugua field by Petrobras, had several of our pumps installed onboard.
In 2008, Modec Offshore Production had awarded a contract to Western Energy for the supply of API 610 Process Pumps, with material of construction ranging from S-6 to D-1 Duplex SS and equipped with API 682 Mechanical Seals – Plan 52. In addition, we had supplied 14 sets of Auto Recirculating valves up to 14” size, used to protect the pumps on board the FPSO by ensuring that a pre-determined minimum flow is assured through at all time.